1 | Benin | Réduction de coût de l'énergie grâce aux énergies renouvelables | Energie | 350 milliards CFA | 27/09/2015 | 30/03/2016 | l’installation de 6500 lampadaires solaires photovoltaïques autonomes dans les principales artères et rues de la ville de Cotonou et ses périphéries et l’installation des microcentrales solaires avec batterie et/ou hybride diesel d’une puissance cumulée | Etat Béninois | SABER | Projet FINI | |
2 | Benin | Construction d'une centrale électrique | Energie | 106.880.000.000 CFA | 10/12/2017 | 30/12/2019 | Construction, exploitation, et maintenance,d'une centrale termique avec dual fuel de 120MW | Etat Béninois | Consortium BWSC-MAN | Projet FINI | |
3 | Benin | Mise en gérance du PORT Cotonou | Infrastructures | Non Disponible | 20/02/2017 | 20/02/2017 | Gestion du port autonome de cotonou | Etat Béninois | Port of Antwerp International SA | Projet FINI | |
4 | Benin | Eclairage public et routiers des principales communes du BENIN | Energie | 13.500.000.000 CFA | 20/09/2019 | 24/02/2020 | Installation de 15571 lampadaires solaires photovoltaïques autonomes dans les principales artères et rues des communes du BENIN | Etat Béninois | Fonroche | Projet FINI | |
5 | Benin | Constructions des Hotels de standing et des ladges | Tourisme | ||||||||
6 | Benin | Construction de logements économiques et sociaux | Cadre de vie | ||||||||
7 | Benin | Construction de 12 cités administratives par département | Cadre de vie | ||||||||
8 | Burkina Faso | Projet de modernisation et de sécurisation des titres de transports et ré-immatriculation des véhicules (PMS-TT) | Transport | 15 319 133 695 FCFA | 12-Aug-16 | 16/01/2017 | 15/01/2022 | la production, selon les standards internationaux (cartes ID sécurisées aux normes ISO) de 3 300 000 cartes grises et permis de conduire | Oberthur Technologies SA | ||
9 | Burkina Faso | Production de cartes consulaires sécurisées pour les ressortissants du Burkina Faso résidant en Côte d’Ivoire | Autres : Documents sécurisés | 01/09/2013 | 01/09/2023 | Production de cartes consulaires sécurisées pour les ressortissants du Burkina Faso résidant en Côte d’Ivoire | Ministère des affaires étrangères et de la coopération régionale | Société SNEDAI | |||
10 | Burkina Faso | Construction clé en main de l’échangeur du nord de Ouagadougou | Transport | 67 087 280 313 F CFA | 26/11/2015 | 15/11/2018 | Construction de l’échangeur du nord de Ouagadougou | Ministère des Infrastructures | SOGEA SATOM | ||
11 | Burkina Faso | Construction, exploitation d’un système d’émission de Passeports à puce électronique (e-Passeports) et d’archivage électronique des dossiers | Autre: Indentification | 9 588 230 309 FCFA | 04/01/2018 | 04/01/2023 | construire, exploiter un système d’émission de Passeports à puce électronique (e-Passeports) et assurer l’archivage électronique des dossiers | Office National d'Identification | Oberthur Technologies SA | ||
12 | Burkina Faso | Construction du boulevard périphérique de Ouagadougou | Transport | 181 068 341 604 FCFA | Construction de route | Ministère des Infrastructures | EBOMAF | ||||
13 | Cabo Verde | Cabeolica Wind Project | Energy | 80M USD | 01/09/2011 | 01/09/2031 | The Cabeólica Wind Project comprises four small, separate wind parks on four of Cabo Verde's nine inhabited islands. The parks have a combined generation capacity of 25.5 MW and were commissioned between December 2011 and July 2012. 1 They are discussed a | 1. Ministry of Industry, Trade and Energy 2. Electra | 1. Africa Finance Corporation (AFC) 2. Finnish Fund for Industrial Cooperation Ltd. (Finnfund) 3. InfraCo | ||
14 | Cabo Verde | Cabo Verde Telecom | Telecom & ICT | 20M USD | 16/05/1995 | 01/05/2019 | It started with Portugal Telecom but Government of Cabo Verde bought their participation in 2019. | 1. UASE | 1. Portugal Telecom | ||
15 | Cabo Verde | Electra | Energy | 16/05/1999 | 16/05/2022 | It started with EDP (Portugal) and ADP (Portugal) but Government of Cabo Verde bought their participation in 2008. | 1. Ministry of Industry, Trade and Energy | 1. Electricidade de Portugal SA 2. Águas de Portugal | |||
16 | Cabo Verde | Complexo Industrial e Logístico de Lazareto - CILL | Industry | 4M USD | 2018 | 16/05/2022 | 16/05/2022 | This project is part of the strategy of promoting Foreign Direct Investment in the islands under jurisdiction of the Northern Chamber of Commerce, as a way of contributing to the regional economic development, putting special attention to relevant project | 1. CIN – Centro Internacional de Negócios (International Business Centre) | 1. Northern Chamber of Commerce – Câmara de Comércio de Barlavento | |
17 | Cabo Verde | Águas de Porto Novo, SA (APN) | Water | 2M USD | 2004 | 16/05/2022 | Águas de Porto Novo is a Joint-stock Company created in 2005, the result of a public-private partnership between the Government of Cabo Verde, Porto Novo Municipal and the company Águas de Ponta Preta Lda. from Sal. The public-private partnership is defin | 1. Municipality of Porto Novo (10%) 2. Government (10%) | Águas de Ponta Preta, LDA – (APP, LDA) (80%) | ||
18 | Cabo Verde | Hospital Nacional de Cabo Verde | Social & Health | 55M USD | 2019 | Hospital Project whose objective consists in the construction of a state-of-the-art hospital for Cabo Verde in which the parties intend to collaborate in the project implementation, financing and management of a modern hospital (“Hospital Project”) in Cab | 1. Ministry of Health and Social Security | 1. VAMED Projet Hospitaliers Internationaux France S.A.S 2. Santa Casa da Misericórdia do Porto | |||
19 | Cabo Verde | Centro Saúde Fazenda | Social & Health | Construction of the health center on Fazenda, using the land and current location as a counterpart | 1. Ministry of Health and Social Security | 1. Khym Negoce | |||||
20 | Cabo Verde | Land Project | Other: Land | 50M USD | Project Land started in 2015 with support of the MCC Compact II and covered four islands to support Cabo Verde in Land Management for Investment Projects. It was done in the 3 main touristic islands: Sal, Boa Vista and Maio and the island of S. Vicente. D | 1. INGT – Land Management National Institute | --- | ||||
21 | Cabo Verde | Hydroponic Green Forage Production | Industry; Energy and Water | 4M USD | 2018 | 16/05/2022 | 16/05/2022 | Hydroponic Green Fodder (FVH) is the live food that will be removed from the greenhouse, without using soil, with low consumption of desalinated water, in full photosynthesis, when the forage has a higher concentration of required vitamins A, B, C and E ( | 1. Municipal of S. Vicente 2. Municipals of Santo Antão (Ribeira Grande, Paul and Porto Novo) | 1. SAT – Sociedade de Assistência Técnica 2. Northern Chamber of Commerce | |
22 | Cabo Verde | FIC, S.A - Business Fair and Events | Other: Business Fairs | 0,2M USD | 2019 | 16/05/2022 | At the end of the 1990s, on the initiative of the government, the FIC project, Cape Verde International Fair, was created, which later, in 2000, became one of the missions of the limited company, FIC, S.A. FIC thus became a public limited company that int | 1. Cabo Verde TradeInvest (20%) | 1. In the future: Chambers of Commerce (80%) | ||
23 | Cabo Verde | CVFF – Cabo Verde Fast Ferry | Transport | 16/05/2022 | 16/05/2022 | In closeout! The Government is selling their share of the Company. Cabo Verde Fast Ferry is a public transport provider in Cape Verde that operates ferry routes. | 1. Ministry of Maritime Economy | 1. Private Sector Shareholders | |||
24 | Cabo Verde | AEB – Agua e Energia da Boa Vista, S.A. | Energy; Water | 8M USD | 16/05/2022 | The company Águas e Energia da Boa Vista (AEB) has a monopoly on the production and distribution of water and energy on the island of Boa Vista, within the scope of concession protocols and agreements entered into with the Government and Electra, SA. AEB | 1. ELECTRA, SARL 2. Sociedade de Desenvolvimento Turístico das ilhas da Boa Vista e Maio (SDTIBM) | 1. BUCAN (60%) (Cabocan) | |||
25 | Cabo Verde | Complexo de Pescas - Cova Inglesa | Other: Fisheries | 2015 | 16/05/2022 | The Government has granted FRESCOMAR, a fish processing company based in Lazareto, São Vicente, the exploration of the Cova de Inglesa Fishing Complex for a period of fifteen years. Cova de Inglesa Fishing Complex (CPCI) ensures the transhipment of fish | 1. Ministry of Maritime Economy | 1. Frescomar | |||
26 | Cabo Verde | CV Interilhas | Transport | 2016 | 16/05/2022 | CV Interilhas is a new Cape Verdean shipowner, constituted in 2019, with which the Government of Cape Verde established the concession contract, for 20 years, for the public service of inter-island passenger and cargo transportation. The new company cons | 1. Ministry of Maritime Economy | 1. Grupo ETE | |||
27 | Cabo Verde | ASA – Aeroportos e Segurança Aérea, S.A. | Transport | ASA - National Airport and Air Safety Company is made up of 4 International Airports and 3 Aerodromes. The Government plans to launch the tender for the opening of capital to the private sector under the PPP regime shortly. | 1. UASE | ||||||
28 | Cabo Verde | CV Handling – Cabo Verde Handling, S.A. | Transport | CV Handling is a company providing groundhandling services at Cape Verde's airports and aerodromes created in 2014. The Government plans to launch the tender for the opening of capital to the private sector under the PPP regime shortly. | 1. UASE | ||||||
29 | Cabo Verde | ENAPOR – Empresa Nacional de Administração dos Portos, S.A. | Transport | ENAPOR is a public limited company that, as the general concessionaire of the ports, has as its object the administration, management and economic exploitation of the Ports of Cape Verde, terminals and port jurisdiction areas, taking care of their conserv | 1. UASE | ||||||
30 | Cabo Verde | Sociedade Gestora da Plataforma de Frio do Mindelo, a Atunlo-CV | Other: Fisheries | 16/05/2022 | Atunlo-CV is the large cold platform in Cabo Verde, providing services for fish storage, treatment and freezing of perishable products, processing and treatment of fish and ice factory. The company will manage the platform on a concession basis for a per | 1. Ministry of Maritime Economy | 1. Atunlo-CV (51 %) 2. Frescomar (33 %) 3. Frigrove (16 %) | ||||
31 | Cabo Verde | Agriculture Logistics Center | Other: Agriculture | Public Private Company to manage the Post-Harvest Centers of the Ministry of Agriculture | 1. Ministry of Agriculture and Environment | ||||||
32 | Cabo Verde | Sal Limpa | Waste | 2009 | 16/05/2022 | 16/05/2022 | Public Private Company responsable for the island sanitation and collection of waste. | 1. Municipality of Sal | 1. Private Investor | ||
33 | Cabo Verde | Expansion of the Santa Maria Wastewater Sanitation System | Waste | 3,5M USD | July 2019 | 01/03/2020 | Exploration and management of the Municipal Sanitation System of Ilha do Sal comprising the activities of collection and treatment of waste water, production and distribution of regenerated water and management and maintenance of the sewage network and in | 1. Municipality of Sal | 1. Águas de Ponta Preta | ||
34 | Côte d'Ivoire | REALISATION DE LA BIBLIOTHEQUE DE LA RENAISSANCE AFRICAINE (BRAA) | CULTURE | 63 000 M FCFA / 96 M EUR / 126 M USD (1 USD = 500 FCFA) | NON DEFINIE | Il s’agit de construire, sur un domaine privé de l’Etat d’un hectare (site de la DECO), une tour de 14 étages qui comprendra : (i) la Bibliothèque de la Renaissance Africaine (BRA) d’une superficie de 21 500 m2 : (ii) un centre des congrès (10 000 m2), (i | MINISTÈRE DE LA CULTURE ET DE LA FRANCOPHONIE | NON DEFINI | |||
35 | Côte d'Ivoire | REHABILITATION DES CITES UNIVERSITAIRES D’ABIDJAN NORD (ABOBO 1, ABOBO 2, WILLAMSVILLE, 220 LOGEMENTS) | Education | A déterminer | NON DEFINIE | Suite à la crise post-électorale qu’a connue la Côte d’Ivoire et du fait de la dégradation avancée des infrastructures universitaires, l’Etat de Côte d’Ivoire a entamé un vaste plan de réhabilitation des dites infrastructures sur son propre budget d’inves | MINISTERE DE L’ENSEIGNEMENT SUPERIEUR ET DE LA RECHERCHE SCIENTIFIQUE | NON DEFINI | |||
36 | Côte d'Ivoire | REHABILITATION DES CITES UNIVERSITAIRES D’ABIDJAN SUD (PORT BOUET 1, PORT BOUET 2, PORT BOUET 3, CITE DES MARIES, VRIDI) | Education | A déterminer | NON DEFINIE | Suite à la crise post-électorale qu’a connue la Côte d’Ivoire et du fait de la dégradation avancée des infrastructures universitaires, l’Etat de Côte d’Ivoire a entamé un vaste plan de réhabilitation des dites infrastructures sur son propre budget d’inves | MINISTERE DE L’ENSEIGNEMENT SUPERIEUR ET DE LA RECHERCHE SCIENTIFIQUE | NON DEFINI | |||
37 | Côte d'Ivoire | AMENAGEMENT ET EXPLOITATION DE L’AUTOROUTE BASSAM – SAMO | Construction | 60 000 M FCFA (2013) / 91,5 M EUR / 120 M USD | NON DEFINIE | Le projet d’autoroute Bassam – Samo (à 40 km de Bassam) constitue la deuxième phase de la construction de la section ivoirienne de l’autoroute du corridor Abidjan-Lagos. Ce projet permettra de faciliter l’accès routier à la cité balnéaire d’Assinie, à l’ | MINISTÈRE DES INFRASTRUCTURES ÉCONOMIQUES | CRCC-LRA | |||
38 | Côte d'Ivoire | CONSTRUCTION ET EXPLOITATION DE LA SECTION 2 DE L’AUTOROUTE ABIDJAN - SAN PEDRO : DABOU - SAN PEDRO | Construction | 690 000 M FCFA (2014) / 915 M USD / 1 200 M USD (1 USD = 500 FCFA) | NON DEFINIE | Le projet consiste en la réhabilitation de la route entre Dabou et San Pedro (environ 400 km). Il permettra de maintenir un accès viable au Sud-Ouest de la Côte d’Ivoire qui abrite la zone de la plus grande production agro-industrielle ainsi que le second | MINISTÈRE DES INFRASTRUCTURES ÉCONOMIQUES | NON DEFINI | |||
39 | Côte d'Ivoire | APPROVISIONNEMENT EN EAU POTABLE DE LA VILLE D’ABIDJAN | Eau | 280 000 M FCFA (2013) / 427 M EUR / 560 M USD (1 USD = 500 CFA) | NON DEFINIE | Il s’agit de régler durablement la question de l’accès à l’eau potable de la ville d’Abidjan à partir d’une eau de surface par la détection d’une source d’eau viable qui pourrait alimenter la ville d’Abidjan pour au moins les 20 prochaines années. Le proj | MINISTÈRE DES INFRASTRUCTURES ÉCONOMIQUES | NON DEFINI | |||
40 | Côte d'Ivoire | EXPLOITATION DU MARCHE CENTRAL DE BOUAKE | Commerce | 19 500 M FCFA (dont 9 000 M FCFA pour le marché) / 29,7 M EUR / 43,3 M USD (1 USD = 500 CFA) | NON DEFINIE | Le projet consiste à exploiter un marché central moderne dans la commune de Bouaké. Le financement de la construction du marché sera assuré par le programme C2D. | MINISTERE DE L’INTERIEUR ET DE LA SECURITE / MAIRIE DE BOUAKE | NON DEFINI | |||
41 | Côte d'Ivoire | Sécurité | 23 000 M FCFA / 35 M EUR / 46 M USD (1 USD = 500 FCFA) | NON DEFINIE | Fourniture et assistance à l’utilisation d’un système intégré de sécurité, de contrôle et d’identification des usagers des aéroports et des voyageurs entrant et sortant du territoire de la Côte d’Ivoire aux postes frontaliers terrestres et sur certains ax | MINISTÈRE DE L'INTÉRIEUR ET DE LA SÉCURITÉ | SECURIPORT | ||||
42 | Côte d'Ivoire | CONSTRUCTION ET EXPLOITATION DE CENTRALES A CHARBON A SAN PEDRO (2*700 MW) | Energie | 847 000 M FCFA / 1 291 M EUR / 1 694 M USD (1 USD = 500 FCFA) | NON DEFINIE | Le projet consiste à construire et exploiter deux centrales à charbon de 700 MW chacune à San Pedro selon les phases suivantes : • Phase 1 (2017) : Installation d’une capacité de 700 MW (SAN PEDRO 1) ; • Phase 2 (2017) : Installation d’une capacité de 700 | MINISTERE DU PETROLE, DE L’ENERGIE ET DU DEVELOPPEMENT DES ENERGIES RENOUVELABLES | NON DEFINI | |||
43 | Côte d'Ivoire | APPROVISIONNEMENT DE LA COTE D’IVOIRE EN GAZ NATUREL LIQUEFIE (GNL) | Energie | 110 000 M FCFA / 168 M EUR / 220 M USD (1 USD = 500 FCFA) | NON DEFINIE | Le projet consiste à approvisionner la Côte d’Ivoire en Gaz Naturel Liquéfié (GNL) en vue de sécuriser l’alimentation du secteur de l’électricité et de réduire le recours au combustible liquide en : • important du GNL. • installant une unité flottante de | MINISTERE DU PETROLE, DE L’ENERGIE ET DU DEVELOPPEMENT DES ENERGIES RENOUVELABLES | Consortium d’opérateurs privés : Total (34 %), SOCAR (26 %), Shell (13 %), Petroci (11 %), CI Énergies (5 %), Golar (6 %) et Endeavor Energy (5 %) | |||
44 | Côte d'Ivoire | CONSTRUCTION D’UNE CENTRALE SOLAIRE PHOTOVOLTAÏQUE A KORHOGO (25 KW) | Energie | 44 000 M FCFA / 67 M EUR / 88 M USD (1 USD = 500 FCFA) | Mi 2017 | Le projet consiste à construire et d’exploiter une centrale solaire photovoltaïque de 25 MW. L’opérateur devra également financer et réaliser les infrastructures de transport associées pour la connexion au réseau national au nom et pour le compte de l’Eta | MINISTERE DU PETROLE, DE L’ENERGIE ET DU DEVELOPPEMENT DES ENERGIES RENOUVELABLES | RECA | |||
45 | Côte d'Ivoire | DELEGATION DE SERVICE PUBLIC DES SERVICES DE PROPRETE DANS L’AGGLOMERATION D’ABIDJAN | Déchets | 54 000 M FCFA (2016) / 82,3 M EUR / 108 M USD (1 USD = 500 CFA) | NON DEFINIE | Le projet consiste en la réalisation d’un circuit de collecte (balayage et transport des déchets), des infrastructures de stockage, de valorisation des déchets dans le District Autonome d'Abidjan. Il s’agit concrètement de construire par zones de producti | MINISTERE DE LA SALUBRITE, DE L’ENVIRONNEMENT ET DU DEVELOPPEMENT DURABLE | NON DEFINI | |||
46 | Côte d'Ivoire | CONCEPTION, CONSTRUCTION, FINANCEMENT ET EXPLOITATION DU CENTRE DE VALORISATION ET D’ENFOUISSEMENT TECHNIQUE DE KOSSIHOUEN | Déchets | 40 000 M FCFA (2016) / 61 M EUR / 80 M USD (1 USD = 500 CFA) | NON DEFINIE | En vue d’atteindre l’objectif d’« Abidjan ville propre », l’Etat de Côte d’Ivoire a lancé, en Juin 2016, un processus de sélection d’opérateurs privés pour la gestion des services de propreté de la ville d’Abidjan, principalement la collecte et le transpo | MINISTÈRE DE L'ASSAINISSEMENT ET DE LA SALUBRITE | CLEAN EBURNIE | |||
47 | Côte d'Ivoire | REHABILITATION D’URGENCE DE 8 HOPITAUX POUR LA COUVERTURE MALADIE UNIVERSELLE (CMU) | Social & Santé | 40 000 M FCFA / 61 M EUR / 80 M USD (1 USD = 500 FCFA) | NON DEFINIE | Le projet consiste à réhabiliter et assurer l’entretien et la maintenance de 8 hôpitaux dans le cadre de l’opérationnalisation de la Couverture Maladie Universelle (CMU) afin de renforcer le plateau technique et doter les services d’outils adéquats afin d | MINISTERE DE LA SANTE ET DE L’HYGIENE PUBLIQUE | NON DEFINI | |||
48 | Côte d'Ivoire | DELEGATION DE SERVICE PUBLIC DE TRANSPORT LAGUNAIRE DE LA VILLE D’ABIDJAN | Transport (routes, rail, air, eau) | 51 000 M FCFA / 78 M EUR / 102 M USD (1 USD = 500 FCFA) | NON DEFINIE | Le projet consiste à développer les infrastructures en matière de transport lagunaire (quais, les appontements, les gares et les stations lagunaires) pour promouvoir les activités de transport lagunaire urbain et assurer la valorisation du potentiel touri | MINISTÈRE DES TRANSPORTS | NON DEFINI | |||
49 | Côte d'Ivoire | CONSTRUCTION ET EXPLOITATION DE LA LIGNE 1 DU METRO D’ABIDJAN | Transport (routes, rail, air, eau) | NON DEFINI | NON DEFINIE | • Ce projet s’inscrit dans le cadre de la recherche de solutions pérennes susceptibles de répondre aux difficultés relatives au transport collectif de voyageurs dans le District d'Abidjan. Il s’agit de construire un système de transport ferroviaire urbain | MINISTÈRE DES TRANSPORTS | STAR (Société de Transport Abidjanais sur Rail) constituée de Bouygues, HyundaÏ Rotem, Dongsan Engineering, Keolis | |||
50 | Côte d'Ivoire | MODERNISATION ET EXTENSION DU QUAI FRUITIER DU PORT D’ABIDJAN | Transport (routes, rail, air, eau) | 40 000 M FCFA / 61 M EUR / 80 M USD (1 USD = 500 FCFA) | NON DEFINIE | • Exploité par la société EOLIS-CI et long de 370 m, le terminal fruitier permet à l’opérateur de bénéficier d’une superficie de terre-pleins de 65 315 m2 et de faire accoster simultanément 2 navires d’environ 160 m de longueur ; le hangar de 15000 m2 pro | MINISTERE DES TRANSPORTS PORT AUTONOME D’ABIDJAN | NON DEFINI |